Homeland Global Park Mohali 2026: August Construction Update, RERA PC0419, ₹1,152 Cr Project, Possession & Buyer Guide
- PropKeyz Editorial Team
Table of Contents
The latest Homeland Global Park Mohali 2026 update gives buyers a useful opportunity to separate the project’s current construction story from the much larger marketing narrative around the mixed-use destination.
Homeland Global Park’s official website has published an August 2026 construction update, while current RERA-linked records identify the main M1-M2 project as PBRERA-SAS81-PC0419, with a recorded project cost of approximately ₹1,152.18 crore and a proposed completion date in Form B of 6 February 2036.
The project is planned as a mixed-use destination combining:
- retail,
- business towers,
- serviced residences,
- entertainment and lifestyle uses.
But there is an important complication for buyers.
The broader Homeland Global Park branding also includes CP Atelier, which has its own separate RERA registration — PBRERA-SAS81-PC0325 — on M3.
That means buyers should not evaluate Homeland Global Park only by asking:
“Global Park ka price kya hai?”
The better questions are:
Which exact RERA registration am I buying under?
M1-M2 or M3?
Which tower or component?
What is the latest registered completion timeline?
What construction progress is independently verifiable today?
What is the total acquisition cost and realistic future user of that space?
PropKeyz View
A large mixed-use project’s brand story is useful for understanding the vision. A buyer’s decision must still come down to the exact RERA registration, unit, cost, construction stage and exit demand.
Key Takeaways
- Homeland Global Park’s official website has published an August 2026 construction update.
- The core current RERA registration for the M1-M2 Homeland Global Park project is PBRERA-SAS81-PC0419.
- Current RERA-linked data records the project cost at approximately ₹1,152.18 crore.
- The Form B completion date currently reflected for PC0419 is 6 February 2036.
- Homeland Global Park PC0419 is separate from CP Atelier PC0325, which covers M3 and has its own completion timeline.
- PC0419 covers approximately 11.8 acres; combining its M1-M2 land with CP Atelier’s separately registered M3 parcel gives approximately 14.28 acres, which helps explain broader “~15 acre” marketing.
- The August construction page does not publish enough written tower-wise metrics to calculate a reliable percentage completion.
- Buyers should not rely on portal possession dates, projected appreciation or generic “Global Park” pricing without matching the offer to the correct RERA project and exact unit.
Homeland Global Park Mohali 2026: Quick Answer
Homeland Global Park is a RERA-registered mixed-use project in Mohali’s Phase VIII Extension / Industrial Focal Point area, associated in market positioning with Sector 75 and International Airport Road.
The current M1-M2 project is registered as:
PBRERA-SAS81-PC0419
and current RERA-linked data records:
- project type: commercial + residential building/tower development,
- project cost: ₹1,152.18 crore approximately,
- start date: 6 February 2026,
- Form B completion: 6 February 2036,
- promoter: Homeland Realty Private Limited,
- mega project: Yes,
- litigation recorded in the captured project data: Nil.
The developer has also published a fresh August 2026 construction update, but that public page does not state a tower-wise percentage completion.
Quick Facts
| Factor | Homeland Global Park |
|---|---|
| Project | Homeland Global Park |
| RERA | PBRERA-SAS81-PC0419 |
| Developer Website Display | PBRERA-SAS81-PC0419-032026 |
| Promoter | Homeland Realty Private Limited |
| Registered Location | M1 M2, Industrial Focal Point, Phase VIII Extension, Mohali |
| Market Location Context | Sector 75 / International Airport Road |
| Project Type | Commercial + Residential |
| Project Status | New / under development |
| RERA-Linked Project Cost | Approx. ₹1,152.18 Cr |
| Registered Land — PC0419 | 47,773.14 sq m |
| Approx. Land Area | 11.8 acres |
| Start Date | 6 Feb 2026 |
| Form B Completion | 6 Feb 2036 |
| Latest Developer Construction Update | August 2026 |
| Exact % Completion | Not established from public August page |
| Public Official Price List | Not established in reviewed material |
| Separate CP Atelier Registration | Yes — PC0325 |

PropKeyz View
The strongest current buyer fact is not a projected rental or appreciation figure. It is that PC0419 is a long-horizon, mixed-use RERA project whose construction and commercial-demand story still needs years of execution.
What Is the Latest August 2026 Construction Update?
Homeland Global Park’s official website currently lists construction updates for:
- July 2025,
- December 2025,
- April 2026,
- August 2026.
The dedicated August page is titled:
Construction Update August, 2026.
This is useful because it confirms that the developer is publicly maintaining a construction-update trail.
But buyers should understand what the page does and does not establish.
What the August Update Confirms
It confirms:
- an August 2026 project update exists,
- the developer is publishing current project imagery,
- Homeland Business Towers and Homeland Park Collection remain active parts of the official project presentation.
What the August Update Does Not Quantify
The page does not provide written numbers for:
- RCC percentage,
- basement percentage,
- slab level,
- floors completed,
- MEP completion,
- façade completion,
- tower-wise delivery percentage,
- revised handover.
PropKeyz View
Construction photos are evidence of activity. They are not a substitute for quantified construction progress.
Why We Are Not Calling the Project “X% Complete”
This distinction is especially important for an under-construction commercial or mixed-use investment.
A photograph can show:
- excavation,
- foundation activity,
- concrete work,
- cranes,
- structural elements.
But it cannot by itself tell a buyer:
what percentage of the contracted project has been completed.
A reliable completion assessment should ideally combine:
- latest RERA quarterly filing,
- architect/engineer certification where available,
- promoter construction update,
- physical site inspection,
- payment-plan stage.
PropKeyz Rule
Never convert a construction photograph into an invented completion percentage.
RERA PC0419: What Is Officially Registered?
Current RERA-linked project data identifies the project as:
Homeland Global Park
with registration:
PBRERA-SAS81-PC0419.
The project website displays the extended version:
PBRERA-SAS81-PC0419-032026.
Buyers should use the project name and core PC0419 identifier to verify the live Punjab RERA record before making payment.
Registered Project Type
The current record classifies Homeland Global Park as:
- Commercial (Building/Tower Development)
- Residential (Building/Tower Development).
Registered Amenities / Uses
The record identifies:
- retail spaces,
- business towers,
- service apartments.
That matches the mixed-use positioning on the project’s official website, which markets:
- High Street,
- Luxe Retail,
- Fine Dine,
- Entertainment,
- Executive Offices,
- Serviced Residences.
Homeland Global Park RERA Facts

| RERA Field | Current Recorded Position |
|---|---|
| Registration | PBRERA-SAS81-PC0419 |
| Project Name | Homeland Global Park |
| Promoter | Homeland Realty Private Limited |
| Project Address | Commercial Allocable Pocket M1 M2, Phase VIII Extension |
| Project Type | Commercial + Residential |
| Project Status | New Project |
| Project Cost | ₹11,52,18,40,681.30 |
| Approx. Project Cost | ₹1,152.18 Cr |
| Start Date | 06-Feb-2026 |
| Form B Completion | 06-Feb-2036 |
| Mega Project | Yes |
| Litigation in Current Captured Record | Nil |
| Total Registered Land | 47,773.14 sq m |
What Does the ₹1,152 Crore Project Cost Actually Mean?
The current RERA-linked project record gives a project cost of:
₹11,52,18,40,681.30
or approximately:
₹1,152.18 crore.
This is an important scale indicator.
But buyers should not confuse it with:
- the project’s market value,
- total sales value,
- revenue potential,
- future valuation,
- guaranteed profitability.
Project Cost
Broadly relates to the development cost recorded for the RERA project.
Unit Price
What an individual buyer pays for:
- a shop,
- office,
- serviced residence,
- other saleable space.
Future Market Value
Depends on:
- completion,
- occupancy,
- tenant demand,
- rents,
- commercial footfall,
- market cycle,
- exit liquidity.
PropKeyz View
A ₹1,152 crore project can indicate scale. It does not tell you whether a specific ₹2 crore unit is correctly priced.
Homeland Global Park vs CP Atelier: The Most Important Clarification
One of the biggest sources of online confusion is that the broader Homeland Global Park identity includes CP Atelier, but RERA treats CP Atelier and the current M1-M2 Homeland Global Park project separately.
The official Global Park site itself displays:
Phase I — CP Atelier
and:
Phase II.
Homeland Global Park — M1 + M2
- RERA: PC0419
- Project name: Homeland Global Park
- Registered land: 47,773.14 sq m
- Start: Feb 2026
- Form B completion: Feb 2036.
CP Atelier — M3
- RERA: PC0325
- Project: CP Atelier
- Registered land: 9,996 sq m
- Start: Mar 2025
- Form B completion: Mar 2035.

PropKeyz View
“Homeland Global Park” may describe the broader destination in marketing, but a buyer agreement must identify the exact registered project that contains the unit being purchased.
Why This Matters Before Booking
Suppose a buyer is offered:
“Homeland Global Park office.”
That description is not enough.
Ask:
- Is it in M1, M2 or M3?
- Which RERA number applies?
- What is the tower name?
- What is the unit number?
- What is the RERA carpet area?
- What is the registered completion date?
- Which entity receives the payment?
PropKeyz Rule
Buy the registered unit—not only the umbrella project name.
11.8 Acres vs 15 Acres: Why Buyers See Different Numbers
The current PC0419 RERA-linked record shows:
47,773.14 sq m
which works out to approximately:
11.8 acres.
Separately, CP Atelier PC0325 covers:
9,996 sq m
or approximately:
2.47 acres.
Combined:
approximately 14.28 acres
This helps explain why many marketing references round the broader destination to roughly:
15 acres.
But this distinction should remain visible.
PC0419 Alone
Approximately 11.8 acres
PC0419 + Separately Registered CP Atelier M3
Approximately 14.28 acres combined
PropKeyz View
Marketing land area and RERA project land area can differ because a larger destination may contain separately registered phases. Always check which area belongs to your registration.
Why the 2025 Construction Updates Need Careful Interpretation
The Global Park website currently archives updates from July and December 2025.
Yet PC0419’s RERA-linked start date is:
6 February 2026.
CP Atelier, meanwhile, has a March 2025 project start date.
Therefore it would be unsafe to say:
“PC0419 construction has been underway since July 2025.”
The older updates may relate to:
- CP Atelier,
- the broader Global Park site,
- early works,
- another phase.
PropKeyz Research Rule
A shared project website does not automatically mean every archived image belongs to the same RERA registration.
What Are the Main Components of PC0419?
The current RERA-linked tower/block schedule records four major blocks.
Homeland One — Retail
Currently listed with:
6 sanctioned/proposed floors
Homeland Park Collection
Currently listed with:
23 sanctioned/proposed floors
Homeland Business Tower — Silicon Tower
Currently listed with:
20 sanctioned/proposed floors
Homeland Business Tower — Tech Tower
Currently listed with:
20 sanctioned/proposed floors.
The official website also positions the project around:
- luxury/high-street retail,
- dining,
- entertainment,
- executive offices,
- serviced residences.

Is Homeland Global Park Mainly Commercial or Residential?
The answer is:
mixed-use.
The current RERA classification includes both:
- commercial,
- residential building/tower development.
Commercial components include:
- retail,
- office,
- entertainment,
- cinemas,
- dining.
The broader project proposition also includes:
- serviced residences.
This distinction matters because each category has a different investment model.
A retail buyer should not analyse the project using the same metrics as:
- an office investor,
- a serviced-residence buyer.
What Does the Current RERA Inventory Tell Us?
The current RERA-linked configuration table contains extensive registered commercial inventory including:
- ground-floor shops,
- first-floor shops,
- second-floor shops,
- lower-ground spaces,
- cinema areas,
- auditorium space.
The project description separately refers to serviced apartments.
Because public datasets can lag or present different inventory layers, a serviced-residence buyer should request the live RERA inventory for the exact offered unit.
PropKeyz View
If a product is being marketed today, its exact unit identity should be traceable to the applicable registered project documentation before booking.
What Is the Possession Date of Homeland Global Park?
This is one of the most important sections of the article.
For PC0419, the current RERA-linked Form B completion reference is:
6 February 2036.
This is materially later than some third-party project pages that currently show dates around:
2030.
For example, certain portals currently advertise a December 2030 possession reference for Global Park inventory.
Which Date Should a Buyer Use?
For legal/project due diligence:
Use the latest applicable Punjab RERA Form B / registered completion timeline.
Do not substitute:
- portal estimate,
- salesperson statement,
- marketing presentation
for the statutory date.

PropKeyz View
A six-year difference in assumed possession can materially change an investment’s holding cost, payment strategy and expected exit.
Does 2036 Mean Every Unit Will Be Delivered Only in 2036?
Not necessarily.
A project’s registered outer completion date does not automatically mean every tower or phase must be handed over only on the last registered date.
Individual components can potentially:
- progress earlier,
- receive approvals earlier,
- be completed in stages,
subject to the project’s approvals and legal framework.
But buyers should not convert that possibility into a guaranteed early handover.
Ask for:
- exact tower completion schedule,
- agreement possession clause,
- construction-linked payment schedule,
- latest RERA progress.
PropKeyz Rule
Earlier delivery can be upside. The registered commitment should remain the risk benchmark until a stronger legally supported timeline is established.
Where Exactly Is Homeland Global Park?
The current PC0419 project address is:
Commercial Allocable Pocket M1 M2, Industrial Focal Point, Phase VIII Extension, Mohali.
The wider project website uses the address context of:
M1, M2, M3, Industrial Focal Point, Mohali Phase 8 Extension, Industrial Area, Sector 75.
Official project branding for Park Collection and Business Towers also uses:
International Airport Road, Sector 75, Mohali.
Therefore the safest buyer description is:
Sector 75 / Phase VIII Extension / Industrial Focal Point, Mohali, within the wider Airport Road commercial corridor.

Why Airport Road Context Matters
Airport Road / PR-7 is one of Mohali’s most important multi-use corridors.
It connects or influences:
- established residential sectors,
- IT City,
- commercial areas,
- institutional zones,
- airport-side development,
- premium housing.
For deeper corridor research:
PR-7 Airport Road Mohali Investment Guide
But a buyer should avoid reasoning:
“Airport Road hai, therefore investment automatically good hai.”
The correct analysis is:
Exact Property → Exact Access → Existing Catchment → Price → Project Stage → Future User → Exit
What Could Drive Retail Demand at Homeland Global Park?
Retail success requires more than attractive architecture.
A strong retail asset usually needs:
- catchment population,
- repeat visitors,
- office workers,
- strong tenant mix,
- parking,
- easy entry/exit,
- entertainment/dining pull,
- sustained occupancy.
The Global Park concept attempts to combine these uses within one destination.
That can potentially create cross-use demand.
For example:
Office workers → weekday F&B / retail
Entertainment → evening/weekend footfall
Serviced residences → hospitality / convenience spending
But this remains an execution thesis.
PropKeyz View
Retail returns are created by occupied stores and repeat customers—not by rendered footfall.
Should Investors Buy Retail Only for “Assured Footfall” Claims?
No.
If any salesperson uses language such as:
“Guaranteed footfall”
ask:
- Which brands are legally signed?
- What is the lease commencement date?
- What is the occupancy commitment?
- Is there a minimum guarantee?
- Who gives the guarantee?
- Is it written in the agreement?
Do not convert a mixed-use project concept into guaranteed retail economics.
What Is the Office Investment Thesis?
Homeland Global Park includes two registered office towers:
- Silicon Tower,
- Tech Tower.
Office demand could potentially be supported by Mohali’s broader:
- IT ecosystem,
- business services,
- corporate expansion,
- airport connectivity,
- Chandigarh-Tricity labour pool.
For wider employment context:
But:
AI/GCC policy ≠ automatic occupancy in one particular building.
Actual office performance depends on:
- completed product,
- floor efficiency,
- parking,
- fit-out,
- tenant acquisition,
- lease economics,
- competing supply.
What Should an Office Buyer Calculate?
Before buying an office unit, calculate:
Total Purchase Cost
Not only BSP.
Usable / Carpet Area
Not only super area.
Expected Rent
Using actual comparable occupied offices.
Maintenance
A premium mixed-use complex can have meaningful operating charges.
Vacancy
Commercial units may remain vacant between tenants.
Fit-Out Cost
Who pays?
Exit Buyer
Will future demand come from:
- investors,
- owner-users,
- companies?
PropKeyz View
An office investment should be underwritten like a business asset—not bought only because the building looks premium.
What About Serviced Residences?
The official project website prominently markets:
Serviced Residences
and the RERA-linked amenities/project description also references service apartments.
This category can appeal to buyers seeking:
- managed accommodation,
- corporate stays,
- short/medium-term occupancy,
- investment use.
But buyers should verify the operating model carefully.
Ask These Questions
- Who operates the serviced residence?
- Is an operator formally appointed?
- Is rental management optional or mandatory?
- What management fee applies?
- What restrictions apply to self-use?
- Is any rental commitment contractual?
- What is the RERA carpet area?
- What GST/tax treatment applies to the specific transaction?
PropKeyz Rule
“Serviced residence” describes a product concept. It does not automatically mean guaranteed hotel-style income.
What Is the Current Price of Homeland Global Park?
The official project material reviewed does not provide one simple public price list applicable to every PC0419 product.
This is sensible because the project contains very different asset classes.
A:
- ground-floor retail unit,
- upper-floor retail unit,
- office,
- serviced residence
cannot be priced by one universal rate.
Third-party portals also show inconsistent information, and some incorrectly mix CP Atelier with Global Park.
Therefore PropKeyz recommends:
Request the current dated cost sheet for the exact unit.
Before Comparing Price, Identify
- RERA registration
- component
- tower
- floor
- unit number
- carpet area
- super/saleable area
- base price
- PLC
- maintenance / IFMS
- parking
- applicable tax
- registration/stamp-duty cost
Do Not Use Developer Price Projections as Market Evidence
Some third-party content currently publishes future per-square-foot projections attributed to marketing/developer material.
These should not be treated as:
- independent valuation,
- guaranteed future price,
- registered transaction evidence.
PropKeyz View
Future price projection is a sales assumption. Current comparable transactions, rents and absorption are market evidence.
Homeland Global Park vs CP Atelier: Which Should a Buyer Compare?
They should first be treated as separate registered propositions.
CP Atelier
RERA PC0325.
Its registered project uses include:
- retail,
- multiplex,
- IT/ITES offices,
- office spaces.
Homeland Global Park PC0419
Includes:
- Homeland One,
- Park Collection,
- Silicon Tower,
- Tech Tower,
- broader mixed-use retail/office/service-apartment programme.
The better investment depends on:
- product type,
- unit,
- price,
- payment schedule,
- completion horizon,
- future user.
What Is the Investment Case for Homeland Global Park?
A reasonable long-term thesis could include:
Location
Sector 75 / Phase VIII Extension with Airport Road positioning.
Scale
RERA-linked project cost above ₹1,150 crore.
Mixed Use
Retail + office + residences + entertainment can potentially diversify footfall.
Business-Corridor Context
Mohali’s office and IT ecosystem could support future demand.
Established Developer Presence
The broader Homeland portfolio already includes projects such as CP67 and Regalia.
But these are only potential strengths.
The investment still depends on:
execution + occupancy + entry price.
What Could Go Wrong?
A balanced buyer guide must also ask the harder questions.
1. Long Completion Horizon
PC0419’s current Form B timeline runs to 2036.
2. Execution Risk
The project is large and mixed-use.
Multiple asset classes have to be delivered successfully.
3. Commercial Absorption
Retail and offices need actual users.
4. Competition
Mohali continues to add commercial inventory.
5. Price Risk
A buyer entering at an aggressive future-growth price may reduce their own upside.
6. Rental Assumptions
Future rents are not guaranteed.
7. Phase Confusion
CP Atelier and PC0419 must not be mixed.
8. Construction Data Lag
Developer imagery and RERA snapshots can update on different timelines.
9. Exit Liquidity
Commercial property can take longer to sell than buyers expect.
PropKeyz View
A prestigious mixed-use vision reduces no investment risk by itself. Execution and price determine whether the vision becomes a good investment.
How Does This Fit Into Mohali’s Wider Commercial Growth?
Mohali currently has several separate commercial-development narratives:
- Airport Road commercial activity,
- IT City,
- Sector 87 future commercial hub,
- GMADA commercial auctions,
- Sector 62 future premium development.
These should not be merged into one bullish story.
For example, the major 2026 GMADA land-sale story is a separate development pipeline.
GMADA E-Auction 2026 Mohali Land Sale Analysis
Likewise, Sector 87’s proposed future commercial hub is a different government-development story:
Sector 87 Mohali Commercial Hub 2026
PropKeyz View
More commercial development can create a stronger business ecosystem—but it also creates more competing inventory.
Is Homeland Global Park a New Launch?
PC0419 is a relatively new 2026 registration and the project is under development.
However, the wider Homeland Global Park destination has activity predating PC0419 because CP Atelier is separately registered from 2025.
Therefore:
“Global Park launched in 2026”
is too simplistic.
Better:
The M1-M2 Homeland Global Park project under PC0419 began its current RERA cycle in February 2026, while the separately registered CP Atelier phase predates it.
For other current Mohali launches:
New Launch Projects in Mohali 2026
Who Should Consider Homeland Global Park?
Long-Horizon Commercial Investors
Who can hold through construction and stabilisation.
Business Owners
Who see strategic value in using an office themselves.
Retail Investors
Who understand tenant and footfall risk.
Serviced-Residence Buyers
Who understand operator and hospitality economics.
Investors Diversifying From Residential Property
Who understand commercial real estate behaves differently.
Who Should Be More Cautious?
Buyers Needing Near-Term Possession
Because the registered project horizon is long.
Investors Depending on Immediate Rent
Construction-stage assets do not provide current operating rent.
Buyers Using Heavy Leverage
Long holding periods increase carrying risk.
Buyers Depending Entirely on Appreciation
No appreciation is guaranteed.
Buyers Who Have Not Identified Their Exact RERA Unit
Do not pay first and clarify the registration later.
Buyer Verification Checklist

1. Confirm the RERA Number
Is your unit under:
PC0419
or:
PC0325?
2. Confirm M1, M2 or M3
This determines the statutory project identity.
3. Confirm the Exact Component
- Homeland One
- Park Collection
- Silicon Tower
- Tech Tower
- CP Atelier
4. Verify Carpet Area
Do not compare only saleable/super area.
5. Request Latest RERA Quarterly Update
Especially because public construction data is not fully synchronised.
6. Request Latest Construction Certificate
If payment is construction-linked.
7. Verify Form B Completion
For PC0419, the currently reflected date is 6 February 2036.
8. Obtain Complete Cost Sheet
Include every charge.
9. Understand Product Use
Retail, office and serviced residences have different rules and economics.
10. Verify Rental Claims
Ask for actual executed comparable leases.
11. Verify Any Operator Agreement
Especially for serviced residences.
12. Understand Transfer / Resale Rules
Important if you plan to exit before completion.
Strong vs Weak Homeland Global Park Investment Thesis
Stronger Thesis
Correct RERA Unit
Clear Product Type
Reasonable Entry Price
Affordable Payment Schedule
Long Holding Capacity
Realistic Rental Assumptions
Commercial Demand Thesis
Clear Exit Strategy
Weaker Thesis
Only Brand Story
Wrong Phase / RERA Confusion
Future Price Projection
Assured Footfall Claim
Assumed 2030 Possession
No Total-Cost Analysis
No Exit Buyer
PropKeyz Analysis
The Homeland Global Park Mohali 2026 story is interesting because it combines three things Mohali investors increasingly look for:
- large-scale mixed-use development,
- Airport Road / Sector 75 positioning,
- premium office, retail and serviced-residence inventory.
The RERA-linked ₹1,152.18 crore project cost also confirms that PC0419 is not a small standalone commercial building.
But size alone does not solve the investment decision.
The most important current issue is time.
Short-Term
The developer is publishing construction updates, including August 2026.
But the project is still in the development cycle.
Medium-Term
Buyers need to watch:
- tower-wise construction,
- commercial leasing,
- retail tenant announcements,
- serviced-residence operating structure,
- infrastructure completion.
Long-Term
The real test will be whether Global Park converts:
built space
into:
occupied offices + operating retail + recurring visitors + paying residents/guests.
That is when a mixed-use destination becomes economically mature.
PropKeyz View
A mixed-use project does not succeed because it contains many uses. It succeeds when those uses reinforce one another after completion.
PropKeyz Investment Stage Framework
Stage 1 — Concept / Destination Vision
Established.
Stage 2 — Phase I / CP Atelier Registration
Established separately under PC0325.
Stage 3 — PC0419 Registration
Established February 2026.
Stage 4 — Current Construction Cycle
Current stage
Stage 5 — Major Structural Progress
Track.
Stage 6 — Building Services / Façade / Fit-Out
Future.
Stage 7 — Completion / Regulatory Approvals
Future.
Stage 8 — Physical Possession
Future.
Stage 9 — Office / Retail Occupancy
Future.
Stage 10 — Stabilised Footfall & Rental Market
Future.
Stage 11 — Mature Resale Market
Future.
PropKeyz Rule
Do not give Stage-10 rental economics or Stage-11 resale value to a project still progressing through Stage 4 construction.
Confirmed vs Still to Verify
| Question | Position as of 30 August 2026 |
|---|---|
| Homeland Global Park RERA PC0419 exists | Confirmed |
| Developer website displays PC0419-032026 | Confirmed |
| Registered promoter is Homeland Realty Pvt Ltd | Confirmed in RERA-linked data |
| Project cost approx. ₹1,152.18 Cr | Confirmed in RERA-linked data |
| Project start 6 Feb 2026 | Confirmed in RERA-linked data |
| Form B completion 6 Feb 2036 | Confirmed in RERA-linked data |
| M1 + M2 registered under PC0419 | Confirmed |
| CP Atelier M3 has separate PC0325 | Confirmed |
| PC0419 land approx. 11.8 acres | Confirmed from registered sq m |
| Wider M1/M2/M3 parcels together approx. 14.28 acres | Calculated from separate registered land areas |
| August 2026 developer construction update exists | Confirmed |
| Exact % construction complete | Not established |
| Every tower’s latest floor achieved | Not established from current public update |
| 2030 is statutory PC0419 completion date | No |
| Public official current unit price | Not established |
| Guaranteed rental yield | No |
| Guaranteed appreciation | No |
Biggest Mistakes Buyers Should Avoid
Mistake 1 — Using CP0325 for Every Global Park Unit
PC0325 applies to CP Atelier.
PC0419 applies to the M1-M2 Homeland Global Park registration.
Mistake 2 — Calling the Whole PC0419 Project 15 Acres
The current PC0419 registered land is approximately 11.8 acres.
Mistake 3 — Treating 2030 as the Statutory Completion Date
Current PC0419 RERA-linked Form B data points to February 2036.
Mistake 4 — Inventing Construction Percentage From Photos
Use quantified project documentation.
Mistake 5 — Buying on Project Cost
₹1,152 crore is not proof your unit price is attractive.
Mistake 6 — Assuming Retail Footfall
Footfall arrives only when users arrive.
Mistake 7 — Assuming Office Rental
Office demand must be proven after usable inventory becomes available.
Mistake 8 — Treating Serviced Residence as Guaranteed Rent
Verify the operator and contract.
PropKeyz Verdict: Homeland Global Park Mohali 2026
The Homeland Global Park Mohali 2026 investment story has become clearer after the latest RERA registration and August construction update.
The main M1-M2 project is currently identified under:
PBRERA-SAS81-PC0419
with:
- registered project cost of approximately ₹1,152.18 crore,
- mixed commercial/residential classification,
- approximately 11.8 acres registered under PC0419,
- start date of 6 February 2026,
- Form B completion date of 6 February 2036.
The official developer website also confirms a fresh August 2026 construction update and presents the destination around retail, offices, entertainment and serviced residences.
But the most important buyer clarification is:
Homeland Global Park PC0419 and CP Atelier PC0325 are separate RERA registrations.
Current online information frequently blurs that distinction.
A second major clarification is:
The developer’s construction imagery confirms continuing activity but does not currently provide enough written information to assign a reliable project-completion percentage.
And the third is:
The current statutory completion reference for PC0419 is 2036—not an automatically assumed 2030 possession date.
Who Should Consider It?
Buyers who:
- understand commercial/mixed-use property,
- can hold for a long development cycle,
- choose an exact product based on demand economics,
- verify the correct RERA registration.
Who Should Wait?
Buyers who:
- need immediate rent,
- need near-term possession,
- cannot absorb construction delays,
- are relying mainly on future appreciation claims.
Final PropKeyz View
Homeland Global Park may have the ingredients of a significant Mohali mixed-use destination, but the investment case should be built on the exact PC0419/PC0325 unit, total cost, construction evidence, registered timeline and future user demand—not the scale of the master vision alone.
Buy today’s registered facts. Treat successful execution, occupancy and future commercial demand as future upside.
Frequently Asked Questions
What is the latest Homeland Global Park Mohali 2026 construction update?
Homeland Global Park’s official website has published an August 2026 construction update. The public page provides current construction imagery, but it does not publish a written tower-wise percentage, slab-level milestone or revised completion date. Buyers should therefore combine the developer update with the latest Punjab RERA quarterly filing and a physical site inspection before judging actual progress.
What is the RERA number of Homeland Global Park Mohali?
The current M1-M2 Homeland Global Park project is identified in RERA-linked data as PBRERA-SAS81-PC0419. The project’s official website currently displays the extended format PBRERA-SAS81-PC0419-032026. Buyers should verify the current Punjab RERA project record before booking.
What is the project cost of Homeland Global Park?
The current RERA-linked project record lists a cost of approximately ₹1,152.18 crore. This is the registered project cost, not the project’s market valuation or guaranteed future sales value. It should be used as a project-scale indicator rather than as evidence that an individual unit is attractively priced.
What is the possession date of Homeland Global Park?
For PC0419, the current RERA-linked Form B completion date is 6 February 2036. Some third-party property portals currently show earlier dates such as 2030, but buyers should use the latest Punjab RERA Form B timeline as the stronger legal reference and verify their unit’s agreement possession clause.
Is Homeland Global Park the same as CP Atelier?
Not exactly. CP Atelier is presented as part of the wider Homeland Global Park destination, but it has a separate RERA registration: PBRERA-SAS81-PC0325 on M3. Homeland Global Park PC0419 covers M1-M2. Buyers should identify which registration contains their exact unit before booking.
How large is Homeland Global Park?
PC0419 itself records 47,773.14 sq m, approximately 11.8 acres. CP Atelier’s separately registered M3 parcel is approximately 2.47 acres. Combined, the two registered land parcels total approximately 14.28 acres, which helps explain broader marketing references to an approximately 15-acre destination.
What does Homeland Global Park include?
The current PC0419 RERA-linked record includes Homeland One retail, Homeland Park Collection and two office towers — Silicon Tower and Tech Tower. The official developer website also markets high-street retail, dining, entertainment, executive offices and serviced residences.
Is Homeland Global Park on Airport Road?
The registered project address is in the Industrial Focal Point / Phase VIII Extension area of Mohali. The wider official project branding positions Homeland Park Collection and Business Towers on International Airport Road, Sector 75, Mohali. Buyers should verify the exact access route and unit location rather than relying only on “Airport Road” marketing.
What is the current price of Homeland Global Park?
No single reliable public official price applies to the entire project because it contains different product categories. Buyers should obtain the latest dated cost sheet for their exact retail, office or serviced-residence unit and compare total acquisition cost rather than only headline BSP.
Is Homeland Global Park a good investment?
It may suit long-horizon investors who understand commercial real estate and can wait through construction and occupancy stabilisation. The key risks are the long registered completion horizon, commercial absorption, unit pricing, execution and future resale liquidity. No rental yield or appreciation should be assumed without evidence.
Explore Property in Mohali
Homeland Global Park is one option within a much broader Mohali market.
Before buying, compare:
- project type,
- RERA,
- exact location,
- construction stage,
- payment timeline,
- existing demand,
- future supply,
- exit liquidity.
Compare New & Under-Construction Projects in Mohali
If you want to compare Homeland Global Park against other current Mohali projects:
Explore New Launch Projects in Mohali 2026
Considering Homeland Global Park? Compare the Exact Unit With PropKeyz
PropKeyz can help you compare an offered Homeland Global Park unit based on:
- RERA registration,
- M1/M2/M3 identification,
- product type,
- carpet area,
- current cost sheet,
- payment plan,
- construction stage,
- completion horizon,
- comparable inventory,
- investment or end-use objective.
WhatsApp CTA
Compare Homeland Global Park Options
Suggested message:
Hi PropKeyz, I read your Homeland Global Park Mohali 2026 analysis. I am considering a unit in Homeland Global Park / CP Atelier. Please help me verify the correct RERA, project phase, unit type, current price, construction stage, possession timeline and investment suitability.
Buying for Investment? Think Beyond the Purchase
For eligible NRI, outstation and local owners across selected Mohali and Tricity locations, PropKeyz may also assist with:
- tenant coordination,
- property inspections,
- maintenance coordination,
- rent follow-up,
- move-in / move-out support,
- ongoing owner updates.
Explore NRI Property Management
Continue Your Mohali Commercial & Investment Research
PR-7 Airport Road Mohali
Understand the broader connectivity corridor behind much of Mohali’s premium residential and commercial development.
Read PR-7 Airport Road Mohali Guide
Mohali AI & GCC Hub 2026
Understand how corporate and technology employment could influence future office and premium housing demand.
GMADA E-Auction 2026
Understand Mohali’s major commercial and development-land transactions and why land-acquisition headlines should be separated from completed property supply.
Sector 87 Mohali Commercial Hub 2026
Compare private mixed-use development with a separate future GMADA commercial-centre story.
Read Sector 87 Mohali Commercial Hub 2026
Sources & Verification
This article was last fact-checked on 30 August 2026.
Homeland Global Park — Official Project Website
The project’s official website confirms:
- PC0419 extended RERA display,
- mixed-use project positioning,
- Phase I CP Atelier / Phase II structure,
- retail, office and serviced-residence positioning,
- Sector 75 / Phase VIII Extension location context,
- August 2026 construction update.
Homeland Global Park Official Website
Punjab RERA-Linked Project Data
Current RERA-linked project data confirms:
- PC0419,
- registered promoter,
- M1-M2 address,
- ₹1,152.18 crore project cost,
- project type,
- 6 February 2026 start,
- 6 February 2036 Form B completion,
- registered land area,
- block/tower schedule.
Buyers should finally reconfirm all fields on the live Punjab RERA portal before making a payment.
CP Atelier RERA-Linked Data
The separately registered CP Atelier project record confirms:
- PC0325,
- M3,
- 9,996 sq m registered land,
- March 2025 start,
- March 2035 completion.
Disclaimer
This article is intended for general real-estate research and buyer education.
It does not constitute:
- legal advice,
- financial advice,
- tax advice,
- valuation advice,
- investment-return advice,
- a promoter price quotation.
Project information can change through:
- RERA updates,
- approved-plan revisions,
- inventory changes,
- construction progress,
- price changes,
- completion extensions,
- regulatory approvals.
PropKeyz does not guarantee:
- project completion on a specific date,
- early possession,
- rental yield,
- retail footfall,
- office occupancy,
- future appreciation,
- resale liquidity.
Before booking, independently verify:
- live Punjab RERA record,
- exact registration,
- tower and unit,
- sanctioned plan,
- carpet area,
- cost sheet,
- agreement for sale,
- payment plan,
- latest construction progress,
- applicable taxes and charges.
Your Property. Our Responsibility.
PropKeyz Editorial Team